EN
The FGC system of the Jiangchuan - Tonghai - Huaning MSW incineration power Generation project in Yuxi, Yunnan, constructed by HEPT, has passed the 72-hour + 24-hour trial operation
2025.10.24
The FGC system of the Jiangchuan - Tonghai - Huaning MSW incineration power Generation project in Yuxi, Yunnan, constructed by HEPT, has passed the 72-hour + 24-hour trial operation since May 28th., 2025.
The design capacity of the project is 700 tons of household waste per day equipped with a 700t/d mechanical furnace waste incinerator +1 medium temperature sub-high pressure waste heat boiler +1 set of C15MW steam turbine generator set. Flue gas treatment adopts the flue gas cleaning process of "SDA rotary spray (deacidification) + dry spray system + activated carbon spray system + bag dust collector + fly ash transportation, storage and stabilization process", which is an EPC project by Huaxing East.

Huaxing-East's reference in Yunnan Province includes: Qujing, Yuxi Jiangchuan Tonghai Hualing, Lincang Gengma, Honghe Hani and Yi Autonomous Prefecture,  Jianshui of Honghe Hani and Yi Autonomous Prefecture, Kunming Songming, Kunming Xishan, Kunming Wuhua,  Jinghong of Xishuangbanna Dai Autonomous Prefecture, Yanshan of Wenshan Zhuang and Miao Autonomous Prefectures, Xichou of Wenshan Zhuang and Miao Autonomous Prefecture, Lijiang and many other projects.


For more information, please click or scan below!
Follow us!